CASE STUDY
Knowle CE Primary School
Task: Design & Full Turnkey Installation
Client: Knowle CE Primary School
Location: Solihull
In 2013, became an academy and in doing so secured the ability to become independent and creative when it came to improving facilities within the school. This installation uses solid grade laminate WC cubicles designed for schools complemented with hygienic wall cladding and slip resistance safety flooring complete with cap & cove perimeter skirting which allows the floorcovering to be continued up the wall at floor to wall junctions to provide a hygienic easy maintained washroom.
All the taps have been specified and supplied by FRANKE. These taps are self-closing taps means water waste and risk of flooding is greatly reduced at the school, as flowing water is automatically shut off after each use.
We’re pleased to hear that both the students and staff at the school are delighted with the new facilities.